• By integrating annular control into the completion run and using wireline for packer setting, it eliminates separate trips for annulus management tools, reducing rig hours.
• Fewer trips and streamlined operations lower day-rate expenses, potentially saving tens to hundreds of thousands of dollars per well.
• The procedure leverages standard nipple profiles and wireline plugs, simplifying tubing integrity tests and packer activation without additional equipment or complexity.
• The GASS likely doubles as a re-entry point for wireline tools, facilitating future interventions without modifying the completion.